
RVD-EM-1002 TriPay Utility Meter
Equip a three-phase service with energy measurement and a prepaid account workflow. This meter combines measurement, event recording…
View specifications +
Bring distributed meter readings into a defined utility data collection plan. This concentrator sits between field meters and the head-end workflow, collecting and reporting observations rather than replacing the billing application. Start procurement with the existing meter population, available communications and the responsibilities for interpreting and recovering data. The reference table lists Local Communication as “Universal Serial, RS485”. Confirm the service connection, communication arrangement and commissioning responsibilities with the utility team before selecting the meter configuration and planning the rollout.
Use this catalog code in your inquiry. Include the installation country, required interfaces and quantity.
Single-phase and three-phase energy meters, DIN-rail meters and data concentrator units.
Discuss the open questions| Parameter | Published specification |
|---|---|
| Electrical | Data |
| Reference Voltage | 3X230V AC , L-N |
| Operating Voltage | 70% - 120% Un |
| Reference Frequency | 50Hz +/- 5% |
| Power Consumption | Voltage circuit <5W, <6 VA |
| Temperature | Operation: -40º to + 55º C Storage: -40º to + 85º C |
| Local Communication | Universal Serial, RS485 |
| Downlink Communication | RF, PLC, Zigbee |
| Uplink Communication | GPRS, 3G, 4G, NB-IoT |
The RAVODEX reference is a catalog SKU. It does not replace the equipment identity in manufacturer datasheets, approvals or service records.
Technical source: Hopeland published product information. Confirm the exact variant, accessories and current documentation in your quotation.
Bring the read point, installation country and host requirements into the quotation. Confirm the exact equipment and documentation before ordering.