
RVD-EM-1001 GridLink Meter Data Hub
Bring distributed meter readings into a defined utility data collection plan. This concentrator sits between field meters and the…
View specifications +
Provide a single-phase service with a customer keypad and prepaid measurement workflow. The device combines energy metering, a clock, a load switch and event records for installations where payment and consumption must be reconciled. Define meter commissioning, credit handling and the recovery procedure before selecting communication and service configurations. The reference table lists Rated Voltage as “230V”. Confirm the service connection, communication arrangement and commissioning responsibilities with the utility team before selecting the meter configuration and planning the rollout. Define the equipment selection and pilot responsibilities before requesting a production quotation.
Use this catalog code in your inquiry. Include the installation country, required interfaces and quantity.
Single-phase and three-phase energy meters, DIN-rail meters and data concentrator units.
Discuss the open questions| Parameter | Published specification |
|---|---|
| Normanative Standard | IEC 62052-11 IEC 62053-21 IEC 62055-31 IEC 62056-21 |
| Accuracy Class | kWh: Class 1.0 |
| Protocol Standard | DLMS/COSEM |
| Rated Voltage | 230V |
| Maximum Current | 60A/80A/100A |
| Frequency Range | 50/60Hz±5% |
| Starting Current | 0.4% Ib |
| Dimension | 122*178*56.5mm |
| Temperature | Operation: -25° C ~ + 75°C Storage: -40° C ~ + 85°C |
| IP Level | ≥IP54 |
The RAVODEX reference is a catalog SKU. It does not replace the equipment identity in manufacturer datasheets, approvals or service records.
Technical source: Hopeland published product information. Confirm the exact variant, accessories and current documentation in your quotation.
Bring the read point, installation country and host requirements into the quotation. Confirm the exact equipment and documentation before ordering.