
RVD-EM-1001 GridLink Meter Data Hub
Bring distributed meter readings into a defined utility data collection plan. This concentrator sits between field meters and the…
View specifications +
Fit prepaid measurement into a rail-mounted installation where panel space and wiring access shape the purchase decision. This compact single-phase meter combines measurement with customer-account functions and local interfaces. Plan the enclosure, service connections and commissioning workflow together so the selected configuration can be assessed as part of the actual installation. The reference table lists Reference voltage (Un) as “220~240V”. Confirm the service connection, communication arrangement and commissioning responsibilities with the utility team before selecting the meter configuration and planning the rollout.
Use this catalog code in your inquiry. Include the installation country, required interfaces and quantity.
Single-phase and three-phase energy meters, DIN-rail meters and data concentrator units.
Discuss the open questions| Parameter | Published specification |
|---|---|
| Reference voltage (Un) | 220~240V |
| Operation voltage | 70% Un~120% Un |
| Limit voltage | 0% Un~190% Un |
| Base current (Ib) | 5A/10A |
| Maximum current (Imax) | 80A/100A |
| Frequency | 50Hz/60Hz |
| Frequency range | 47.5~52.5Hz |
| Accuracy class | CI.1 as per IEC 62053-21 CI.2 as per IEC 62053-23 |
| Starting current | 0.4%Ib |
| Pulse constant | 1000imp/kWh 1000imp/kVARh |
| IP Grade | IP54 |
| Utilization Class | UC2 |
| Connection Type | Din Sequential |
| Electrostatic discharge | Contact discharge: 8kV |
| Fast transient burst | 4 kV/100 kHz, IEC 61000-4-4 |
| Immunity to HF Fields | 80MHz-2GHz@10V/m with load |
| Conducted disturbances | 150kHz - 80MHz 10V/m, IEC 61000-4-6 |
| Radio Interference | CISPR 22, IEC 61000-4-2,3,4,6 |
| Over-voltage | 400VAC for 48 hours, IEC 62053021 |
| Surge immunity | 30kA/kV , 4/10µs, IEC 61000-4-5 |
The RAVODEX reference is a catalog SKU. It does not replace the equipment identity in manufacturer datasheets, approvals or service records.
Technical source: Hopeland published product information. Confirm the exact variant, accessories and current documentation in your quotation.
Bring the read point, installation country and host requirements into the quotation. Confirm the exact equipment and documentation before ordering.