
RVD-EM-1001 GridLink Meter Data Hub
Bring distributed meter readings into a defined utility data collection plan. This concentrator sits between field meters and the…
View specifications +
Connect commercial or light industrial metering to a defined utility data collection process. This meter combines three-phase measurement with local communication, a modular modem, tamper detection and diagnostic functions. Select the communication arrangement against the receiving system’s requirements and establish who will commission, monitor and maintain each metering point. The reference table lists Network as “3 Phase 4 Wires network”. Confirm the service connection, communication arrangement and commissioning responsibilities with the utility team before selecting the meter configuration and planning the rollout.
Use this catalog code in your inquiry. Include the installation country, required interfaces and quantity.
Single-phase and three-phase energy meters, DIN-rail meters and data concentrator units.
Discuss the open questions| Parameter | Published specification |
|---|---|
| Network | 3 Phase 4 Wires network |
| Reference Voltage | 3X110-120, 220-240/200-415V |
| Operating Voltage | 70% - 120% Un |
| Basic Current Ib | 5A/10A |
| Maximum Current Imax | 80A/100A |
| Power Consumption | Voltage circuit <1W, <2.5VA Current circuit < 0.25VA |
| Reference Frequency | 50/60Hz +/- 5% |
| Normanative Standard | IEC 62053-21 IEC 62053-23 IEC 62056-21/46/53/61/62 EN 50470 |
| Accuracy Class | kWh: Class 1.0 kvarh: Class 2.0 |
| Communication | Optical, RS-485, Modular modem |
| Protocol | DLMS/COSEM, DL/T 698 |
| CIU Communication | RF/PLC/M-bus |
| Enclosure | IP54 IEC 60529 |
The RAVODEX reference is a catalog SKU. It does not replace the equipment identity in manufacturer datasheets, approvals or service records.
Technical source: Hopeland published product information. Confirm the exact variant, accessories and current documentation in your quotation.
Bring the read point, installation country and host requirements into the quotation. Confirm the exact equipment and documentation before ordering.